Okay, here‟s something that we can talk about now, but have been keeping under wraps until we got itdone. Again, special thanks again to Shawn Carey and Jody Schiefley for this magic act.   There‟s a brand new fishway now installed at the Maple Hill Power Dam and if that‟s not great news, then you don‟t know the Saugeen River or the steelhead that swim up it. For the past two months, it seems that I‟ve spent more time at Maple Hill than I have at home meeting with Schiefley, engineer Jeff Graham and a corps of dedicated contractors that have been installing forms, pouring cement and installing strategically placed steel guide racks and stop logs.   Remember also, there is already one fishway installed on the opposite side of the river near the power plant. Now the fish have a choice of moving up and over the dam at two separate locations.   Again, this latest project was imperative to getting the returning adult steelhead spawning in the Beatty Saugeen. Think about it. Less than a year ago we had two barriers on the Saugeen between Walkerton and Hanover preventing steelhead movement to our prime target waters.   I personally would like to once again thank Shawn Carey, Jody Schiefley and the crews and contractors that Jody has put in place to complete these manmade marvels.